Nashville Commercial Air Conditioning Services

Ray & Son Heating & Air Conditioning has the necessary team, skills, and equipment to handle even the most extensive commercial air conditioning projects. With 50 years of business under our belts and an all-star team of NATE certified air conditioning technicians we are equipped to handle any commercial air conditioning job.

View our Commercial Resume here.

Commercial Repairs

Commercial air conditioning repair is, more often than not, needed to be completed ASAP! We understand this matter and give our customers the fastest commercial air conditioning repair service in the South Georgia and North Florida area. Our technicians are fully trained, have years of commercial air conditioning repair experience, and are familiar with doing quality work quickly to get your air conditioning up and running in no time.

Commercial Installations

In addition to providing excellent commercial air conditioning repair services, we also do installations for our customers in North Florida and South Georgia! Our NATE certified technicians can help assess the area to help you decide on the right commercial air conditioning system for the space. Once the system is chosen we can have it installed for you in no time at all.

Commercial Maintenance

The best way to protect your commercial air conditioning system and to keep it working great is through regular and routine maintenance. Scheduling consistent tune-ups and maintenance of your air conditioning system will help you save money by ensuring efficiency and preventing costly and unexpected repairs. At Ray & Son HVAC, we offer our commercial air conditioning customers special service agreements and maintenance programs that will help you save even more money and keep your air conditioning in excellent shape!

A letter from one of our many satisfied commercial customers.

REQUEST SERVICE

Call Today to Schedule (229) 686-5531

A letter from one of our many satisfied commercial customers.

April, 15, 2016

Mike,

Ray and Son performed as a team player on several of my projects both with the Plumbing and the Mechanical at the Westin Perimeter Atlanta, Westin Coral Gables, Hyatt Alabama. Examples include: working on assisting with design, participating in weekly coordination meetings, leading the project by use of closely coordinated tasks and always ahead of schedule coordinated by there a fulltime on site superintendent Santiago Yepes, William Alligood or George Beecher. The project managers always are thoroughly involved with the day to day operations and knowledgeable with the Hospitality industry. Mike DiTomasso & John Cain were exceptional to deal with from bid to completion. All always conducting themselves professionally and they were an intricate part of our team and the success of the project. Ray & Son superintendents were professional and did an excellent job of organizing, managing, and dealing with the Hotel’s staff throughout the course of the project while maintaining all fully operational. Ray & Son has handled every issue, both large and small, appropriately and effectively. Their performance on these several projects, continue to provide us with high level of trust and look forward to our continued business ventures.

Sincerely,

Signature

Bobby Paasch

Senior Project Manager, Atrium Hospitality

Google-Reviews ray-and-son-facebook-review-rating

(Last Updated 5/3/17)

Examples of Our Projects

Baca Raton Beach Club and Resort, Baco Raton, FL

work-resume-images-boca-raton-beach-club

Our Role:
We performed a complete overhaul of the mechanical system including the installation of a complete chilled water system consisting of a 211 ton water cooled screw chiller, (4) 100% outside air units, (8) central station air handlers, (1) cooling tower and condenser loop, (200) vertical stack water source heat pumps, (27) horizontal water source heat pumps, chemical treatment and complete DDC control system.

Dates of Construction
Began: August 2007
Completed: May 2009
Point of Contact for Reference
IDC Construction
Gary Sams
678-520-3606

AAFES Shopping Center, Fort Benning Army Base, Columbus, GA

work-resume-images-shopping-center01 work-resume-images-shopping-center02
Our Role
We completed the HVAC and Plumbing (interior) portion of work on the project. The HVAC consisted (36) Unitary Roof-Top Units with gas heat with complete ductwork system and air distribution. The plumbing system was complete stubbed 5’ including all sanitary piping, domestic water piping, roof drain piping and gas piping.

Dates of Construction
Began: September 2006
Completed: November 2007

Point of Contact for Reference
Baggette Construction
Lyle Pickens
256-353-0123

Westover High School , Albany, GA

work-resume-images-westover-high-school

Our Role
We performed a complete mechanical overhaul including the following: replacement of the existing cooling tower, addition of new condenser water piping, replacement of existing heating how water system including replacement of (4) boilers and heat exchanger, installation of a 200 ton screw chiller, installation of (57) water source heat pumps, (27) rooftop units, chemical treatment and DDC controls.

Dates of Construction
Began: July 2008
Completed: August 2010

Point of Contact for Reference
Construction CGM, Inc.
Keith Middleton
229-758-2770